{"id":4402,"date":"2020-08-31T11:08:21","date_gmt":"2020-08-31T08:08:21","guid":{"rendered":"https:\/\/pohjois-pohjanmaa.fi\/?page_id=4402"},"modified":"2021-09-20T09:30:59","modified_gmt":"2021-09-20T06:30:59","slug":"1-vaihemaakuntakaava-lainvoimainen","status":"publish","type":"page","link":"https:\/\/www.pohjois-pohjanmaa.fi\/en\/kehittaminen\/maakuntakaava\/1-vaihemaakuntakaava-lainvoimainen\/","title":{"rendered":"1st phase county plan"},"content":{"rendered":"<h2 class=\"wp-block-heading\">The 1st phase county plan is legally valid<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The topics to be addressed in the first phase (1st phase regional plan) are:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>energy production and transmission (continental wind areas, offshore wind power upgrades, peat production areas)<\/li><li>trade service structure and regional structure, agglomerations<\/li><li>natural environment (use of sites, upgrades of protected areas, geological formations)<\/li><li>the transport system (road network, light transport, rail transport, air transport, maritime transport) and logistics.<\/li><\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Attendance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The draft phase county plan was available from 28 August to 26 September 2012<br>The proposal for the 1st phase county plan was available from 20 September to 21 October 2013.<br>The regional council approved the 1st phase county plan on 2 December 2013.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Confirmation decision<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The Ministry of the Environment confirmed the 1st phase county plan:<br><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/4068.pdf\">Confirmation decision of 23 November 2015<\/a><br>Annexes:<br>Extracts: <a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/3814.pdf\">map 2<\/a>, <a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/3813.pdf\">map 3<\/a>, <a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/3812.pdf\">markings<\/a><br><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/3811.pdf\">Announcement of 7 December 2015<\/a><br><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/3792.pdf\">Press release of the Regional Council of Northern Ostrobothnia 25.11.2015<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Five appeals were lodged against the Ministry of the Environment's declaratory decision before the Supreme Administrative Court. <a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/4167.pdf\">On 2 May 2016, the provincial government issued a statement to the Supreme Administrative Court on the complaints.<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/4757.pdf\">Northern Ostrobothnia 1st phase county plan final<\/a><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Confirmed 1st phase regional plan<\/h3>\n\n\n\n<ul class=\"wp-block-list\"><li>Provincial zoning maps: Phase 1 regional plan 1:250 000 (3 journals):<br><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/2468.pdf\">Journal 1<\/a>, <a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/2469.pdf\">Journal 2<\/a>, <a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/2470.pdf\">Journal 3<\/a><\/li><li><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/2471.pdf\">Regional plan entries and regulations<\/a><\/li><li><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/2473.pdf\">Combined map of regional plans 1:300 000<\/a><\/li><li><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/2472.pdf\">Plan statement and its appendices<\/a><\/li><li><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/2454.pdf\">Effects of Kiiminkijoki peat production on water bodies and Natura assessment<\/a> + <a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/2465.pdf\">Attachment map 3<\/a> and <a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/2466.pdf\">appendix map 4<\/a><\/li><\/ul>\n\n\n\n<ol class=\"wp-block-list\"><li>Complaints and statements concerning the approval of the phase-province plan:<br><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/3103.pdf\">Appeals and responses of 25 August 2014<\/a><br><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/3102.pdf\">Summary of opinions and responses 25.8.2014<\/a><\/li><\/ol>\n\n\n\n<h3 class=\"wp-block-heading\">Background studies for the phase county plan<\/h3>\n\n\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/967.pdf\">Participation and evaluation plan, updated on 18 June 2012<\/a><\/li><li><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/93.pdf\">Northern Ostrobothnia Climate Strategy<\/a><\/li><li><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/109.pdf\">Climate Strategy Sector Programmes<\/a><\/li><li><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/991.pdf\">Northern Ostrobothnia Energy Strategy 2020<\/a><\/li><li><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/720.pdf\">North Ostrobothnia Trade Service Network Report 2030<\/a><\/li><li><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/2305.pdf\">Trade Services Network 2030, supplementary report<\/a><\/li><li><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/125.pdf\">Wind power survey of the North and Central Ostrobothnia mainland region 2011<\/a><\/li><li><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/2303.pdf\">Supplementary report on wind power 2013<\/a><\/li><li><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/2495.pdf\">Observations of the wind power survey<\/a><\/li><li><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/2462.pdf\">Impact assessment of wind farms<\/a><\/li><li>Vision analysis maps for continental wind farms: <a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/2543.pdf\">Part 1.<\/a> and <a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/2544.pdf\">Part 2<\/a>.<\/li><li><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/2464.pdf\">Migratory bird survey 2013<\/a><\/li><li>Target cards for wind energy survey:<a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/3550.pdf\"> Part 1<\/a>, <a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/3551.pdf\">Part 2<\/a> , <a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/2302.pdf\">target cards for the complementary study;<\/a><\/li><li><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/2451.pdf\">Review of the state of peatland biodiversity in Northern Ostrobothnia<\/a><\/li><li><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/2455.pdf\">Summary of Nature Surveys<\/a><\/li><li><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/2452.pdf\">Summary of peat resources in Northern Ostrobothnia and their production potential<\/a><\/li><li><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/2457.pdf\">Apa development series by Nybyn-Iso Heposuo; dozens of rings from the shore of the Bothnian Bay to a height of 60 meters<\/a><\/li><li><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/2453.pdf\">Assessment of the water impacts of peat production in Northern Ostrobothnia 2012-2040; Part 1: load analysis;<\/a><\/li><li><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/2456.pdf\">Assessment of the water impacts of peat production in Northern Ostrobothnia 2012-2040; Part 2: Assessment of water risk using the multi-objective assessment method<\/a><\/li><li><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/92.pdf\">Transport strategy Kakepoli<\/a><\/li><li>Transmission line reports Fingrid: <a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/2461.pdf\">Transmission lines at Hanhikivi sites<\/a> , <a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/2458.pdf\">Valkeus-Vihanti 110 kV background check<\/a> , <a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/2460.pdf\">Main grid reinforcement needs<\/a> , <a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/2463.pdf\">Report Hanhikivi local connection power lines<\/a><\/li><li><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/2467.pdf\">Logistics Strategy for Northern Finland 2013<\/a><\/li><li><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/992.pdf\">SOul Corridor Reports: VTT study<\/a><\/li><li><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/193.pdf\">National moraine areas<\/a><\/li><li><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/3556.pdf\">National wind and shore deposits<\/a><\/li><li><a href=\"https:\/\/pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/08\/190.pdf\">Oulu - River Ii River Basin Management Plan<\/a><\/li><\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Other evidence<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.pohjois-pohjanmaa.fi\/en\/kehittaminen\/maakuntakaavoitus\/pohjois-pohjanmaan-ja-lansi-kainuun-suo-ohjelma\/\">North Ostrobothnia and Western Kainuu swamp programme<\/a>a<\/p>","protected":false},"excerpt":{"rendered":"<p>The topics to be dealt with in the first phase (1st phase county plan) are: energy production and transmission (continental wind areas, offshore wind energy upgrades, peat production areas) trade service structure and regional structure, agglomerations natural environment (use of land, upgrades of protected areas, geological formations) transport system (road network, light transport, rail transport, air transport, maritime routes) and logistics. The draft phase county plan was available from 28 August to 26 September 2012. The proposal for the phase county plan was available from 20 September to 21 October 2013. The 1st phase county plan was approved by the county council on 2 December 2013. Confirmation decision The Ministry of the Environment confirmed the 1st phase regional plan:Confirmation decision 23.11.2015Attachments:Extracts: map 2, map 3, markingsConsultation 7.12.2015Press release of the Regional Council of Northern Ostrobothnia 25.11.2015 Five appeals against the Ministry of the Environment's confirmation decision were filed with the Supreme Administrative Court. On 2 May 2016, the provincial government issued a statement to the Supreme Administrative Court on the complaints. Northern Ostrobothnia 1st Stage Provincial Plan Final Confirmed 1st Stage Provincial Plan Regional Plan Maps: 1st phase regional plan 1:250 000 (3 magazines):magazine 1, magazine 2, magazine 3 Regional plan entries and regulations Combined map of regional plans 1:300 000 The description of the plans and its appendices Water impacts of peat production in the River Kiiminkijoki and Natura assessment + appendix map 3 and appendix map 4 Complaints and statements concerning the approval of the phase regional plan: Complaints and responses 25.8.2014 Compilation of statements and responses 25.8.2014 Background studies of the phase regional plan Participation and assessment plan, updated 18.6.2012 Northern Ostrobothnia Climate Strategy Climate Strategy Sector Programmes Northern Ostrobothnia Energy Strategy 2020 Northern Ostrobothnia [\u2026]<\/p>","protected":false},"author":46,"featured_media":0,"parent":4324,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"class_list":["post-4402","page","type-page","status-publish","hentry"],"acf":{"alternative-title":"","color_layout":false},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>1. vaihemaakuntakaava - Pohjois-Pohjanmaan liitto<\/title>\n<meta name=\"description\" content=\"1. vaihemaakuntakaava on lainvoimainen Ensimm\u00e4isess\u00e4 vaiheessa (1. vaihemaakuntakaava) k\u00e4sitelt\u00e4v\u00e4t aihepiirit ovat: energiantuotanto ja -siirto\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pohjois-pohjanmaa.fi\/en\/kehittaminen\/maakuntakaava\/1-vaihemaakuntakaava-lainvoimainen\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"1. vaihemaakuntakaava - Pohjois-Pohjanmaan liitto\" \/>\n<meta property=\"og:description\" content=\"1. vaihemaakuntakaava on lainvoimainen Ensimm\u00e4isess\u00e4 vaiheessa (1. vaihemaakuntakaava) k\u00e4sitelt\u00e4v\u00e4t aihepiirit ovat: energiantuotanto ja -siirto\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pohjois-pohjanmaa.fi\/en\/kehittaminen\/maakuntakaava\/1-vaihemaakuntakaava-lainvoimainen\/\" \/>\n<meta property=\"og:site_name\" content=\"Pohjois-Pohjanmaan liitto\" \/>\n<meta property=\"article:modified_time\" content=\"2021-09-20T06:30:59+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.pohjois-pohjanmaa.fi\\\/kehittaminen\\\/maakuntakaava\\\/1-vaihemaakuntakaava-lainvoimainen\\\/\",\"url\":\"https:\\\/\\\/www.pohjois-pohjanmaa.fi\\\/kehittaminen\\\/maakuntakaava\\\/1-vaihemaakuntakaava-lainvoimainen\\\/\",\"name\":\"1. vaihemaakuntakaava - Pohjois-Pohjanmaan liitto\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pohjois-pohjanmaa.fi\\\/#website\"},\"datePublished\":\"2020-08-31T08:08:21+00:00\",\"dateModified\":\"2021-09-20T06:30:59+00:00\",\"description\":\"1. vaihemaakuntakaava on lainvoimainen Ensimm\u00e4isess\u00e4 vaiheessa (1. vaihemaakuntakaava) k\u00e4sitelt\u00e4v\u00e4t aihepiirit ovat: energiantuotanto ja -siirto\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.pohjois-pohjanmaa.fi\\\/kehittaminen\\\/maakuntakaava\\\/1-vaihemaakuntakaava-lainvoimainen\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.pohjois-pohjanmaa.fi\\\/kehittaminen\\\/maakuntakaava\\\/1-vaihemaakuntakaava-lainvoimainen\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.pohjois-pohjanmaa.fi\\\/kehittaminen\\\/maakuntakaava\\\/1-vaihemaakuntakaava-lainvoimainen\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Kehitt\u00e4minen\",\"item\":\"https:\\\/\\\/www.pohjois-pohjanmaa.fi\\\/kehittaminen\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Maakuntakaavoitus\",\"item\":\"https:\\\/\\\/www.pohjois-pohjanmaa.fi\\\/kehittaminen\\\/maakuntakaava\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"1. vaihemaakuntakaava\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.pohjois-pohjanmaa.fi\\\/#website\",\"url\":\"https:\\\/\\\/www.pohjois-pohjanmaa.fi\\\/\",\"name\":\"Pohjois-Pohjanmaan liitto\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.pohjois-pohjanmaa.fi\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.pohjois-pohjanmaa.fi\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.pohjois-pohjanmaa.fi\\\/#organization\",\"name\":\"Pohjois-Pohjanmaan liitto\",\"url\":\"https:\\\/\\\/www.pohjois-pohjanmaa.fi\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.pohjois-pohjanmaa.fi\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.pohjois-pohjanmaa.fi\\\/wp-content\\\/uploads\\\/2020\\\/07\\\/ppl_logo.png\",\"contentUrl\":\"https:\\\/\\\/www.pohjois-pohjanmaa.fi\\\/wp-content\\\/uploads\\\/2020\\\/07\\\/ppl_logo.png\",\"width\":173,\"height\":60,\"caption\":\"Pohjois-Pohjanmaan liitto\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pohjois-pohjanmaa.fi\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"1. vaihemaakuntakaava - Pohjois-Pohjanmaan liitto","description":"1. vaihemaakuntakaava on lainvoimainen Ensimm\u00e4isess\u00e4 vaiheessa (1. vaihemaakuntakaava) k\u00e4sitelt\u00e4v\u00e4t aihepiirit ovat: energiantuotanto ja -siirto","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pohjois-pohjanmaa.fi\/en\/kehittaminen\/maakuntakaava\/1-vaihemaakuntakaava-lainvoimainen\/","og_locale":"en_GB","og_type":"article","og_title":"1. vaihemaakuntakaava - Pohjois-Pohjanmaan liitto","og_description":"1. vaihemaakuntakaava on lainvoimainen Ensimm\u00e4isess\u00e4 vaiheessa (1. vaihemaakuntakaava) k\u00e4sitelt\u00e4v\u00e4t aihepiirit ovat: energiantuotanto ja -siirto","og_url":"https:\/\/www.pohjois-pohjanmaa.fi\/en\/kehittaminen\/maakuntakaava\/1-vaihemaakuntakaava-lainvoimainen\/","og_site_name":"Pohjois-Pohjanmaan liitto","article_modified_time":"2021-09-20T06:30:59+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.pohjois-pohjanmaa.fi\/kehittaminen\/maakuntakaava\/1-vaihemaakuntakaava-lainvoimainen\/","url":"https:\/\/www.pohjois-pohjanmaa.fi\/kehittaminen\/maakuntakaava\/1-vaihemaakuntakaava-lainvoimainen\/","name":"1. vaihemaakuntakaava - Pohjois-Pohjanmaan liitto","isPartOf":{"@id":"https:\/\/www.pohjois-pohjanmaa.fi\/#website"},"datePublished":"2020-08-31T08:08:21+00:00","dateModified":"2021-09-20T06:30:59+00:00","description":"1. vaihemaakuntakaava on lainvoimainen Ensimm\u00e4isess\u00e4 vaiheessa (1. vaihemaakuntakaava) k\u00e4sitelt\u00e4v\u00e4t aihepiirit ovat: energiantuotanto ja -siirto","breadcrumb":{"@id":"https:\/\/www.pohjois-pohjanmaa.fi\/kehittaminen\/maakuntakaava\/1-vaihemaakuntakaava-lainvoimainen\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pohjois-pohjanmaa.fi\/kehittaminen\/maakuntakaava\/1-vaihemaakuntakaava-lainvoimainen\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.pohjois-pohjanmaa.fi\/kehittaminen\/maakuntakaava\/1-vaihemaakuntakaava-lainvoimainen\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Kehitt\u00e4minen","item":"https:\/\/www.pohjois-pohjanmaa.fi\/kehittaminen\/"},{"@type":"ListItem","position":2,"name":"Maakuntakaavoitus","item":"https:\/\/www.pohjois-pohjanmaa.fi\/kehittaminen\/maakuntakaava\/"},{"@type":"ListItem","position":3,"name":"1. vaihemaakuntakaava"}]},{"@type":"WebSite","@id":"https:\/\/www.pohjois-pohjanmaa.fi\/#website","url":"https:\/\/www.pohjois-pohjanmaa.fi\/","name":"Pohjois-Pohjanmaan liitto","description":"","publisher":{"@id":"https:\/\/www.pohjois-pohjanmaa.fi\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pohjois-pohjanmaa.fi\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/www.pohjois-pohjanmaa.fi\/#organization","name":"Pohjois-Pohjanmaan liitto","url":"https:\/\/www.pohjois-pohjanmaa.fi\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.pohjois-pohjanmaa.fi\/#\/schema\/logo\/image\/","url":"https:\/\/www.pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/07\/ppl_logo.png","contentUrl":"https:\/\/www.pohjois-pohjanmaa.fi\/wp-content\/uploads\/2020\/07\/ppl_logo.png","width":173,"height":60,"caption":"Pohjois-Pohjanmaan liitto"},"image":{"@id":"https:\/\/www.pohjois-pohjanmaa.fi\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.pohjois-pohjanmaa.fi\/en\/wp-json\/wp\/v2\/pages\/4402","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pohjois-pohjanmaa.fi\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.pohjois-pohjanmaa.fi\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.pohjois-pohjanmaa.fi\/en\/wp-json\/wp\/v2\/users\/46"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pohjois-pohjanmaa.fi\/en\/wp-json\/wp\/v2\/comments?post=4402"}],"version-history":[{"count":22,"href":"https:\/\/www.pohjois-pohjanmaa.fi\/en\/wp-json\/wp\/v2\/pages\/4402\/revisions"}],"predecessor-version":[{"id":26550,"href":"https:\/\/www.pohjois-pohjanmaa.fi\/en\/wp-json\/wp\/v2\/pages\/4402\/revisions\/26550"}],"up":[{"embeddable":true,"href":"https:\/\/www.pohjois-pohjanmaa.fi\/en\/wp-json\/wp\/v2\/pages\/4324"}],"wp:attachment":[{"href":"https:\/\/www.pohjois-pohjanmaa.fi\/en\/wp-json\/wp\/v2\/media?parent=4402"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}