The aim of the project was to ensure the availability of good quality groundwater and, on the other hand, to secure the sufficiency of aggregate suitable for different purposes.
A concrete result of the project
1) was to allocate ridge areas reserved for groundwater abstraction and a sufficient number of suitable rock, sand and gravel areas for the production of aggregates.
2) was a threefold classification of ridge areas and rock areas.
• areas suitable for soil extraction;
• areas partially suitable for soil extraction;
• areas unsuitable for soil extraction